SPONSORED
Editor

Laura Bennett

Rondo and Rio Tinto begin FEED on 360-MWh heat battery at Yarwun

Rondo and Rio Tinto begin FEED on 360-MWh heat battery at Yarwun

Rondo Energy and Rio Tinto start FEED on a 360-MWh heat battery at Queensland's Yarwun alumina refinery.

October 21, 2026• 1 min
SL Rack shows fast compliant mounting for rooftop solar systems

SL Rack shows fast compliant mounting for rooftop solar systems

Demands on rooftop mounting are rising as regulations tighten and installation speed remains critical.

October 21, 2026• 1 min
ACME Solar Signs 300MW Peak PPA with SECI at INR 6/kWh

ACME Solar Signs 300MW Peak PPA with SECI at INR 6/kWh

ACME Solar secures a 300MW/1,200MWh FDRE contract with SECI at nearly double its previous solar tariff.

October 20, 2026• 1 min
Ameren Illinois activates $20M solar-plus-storage facility in Peoria

Ameren Illinois activates $20M solar-plus-storage facility in Peoria

The 2.5-MW Peoria Renewable Energy Center pairs 5,000 panels with a 1.5-MW battery system.

October 20, 2026• 1 min
TCL SunPower Opens Origin Orders in Europe With 40-Year Warranty

TCL SunPower Opens Origin Orders in Europe With 40-Year Warranty

TCL SunPower opens European Origin orders with a 40-year warranty and up to 505 W rating.

October 20, 2026• 1 min
South Australia picks four bids for 13 GW Whyalla West renewable zone

South Australia picks four bids for 13 GW Whyalla West renewable zone

South Australia picks Windlab, Altra, Heron and Neoen for nearly 13 GW Whyalla West zone.

October 20, 2026• 1 min
Shaker Heights Activates 900-Panel Solar Array at Public Works Facility

Shaker Heights Activates 900-Panel Solar Array at Public Works Facility

Ohio city locks in solar kWh cost for 30 years, expects ITC of over $416,000.

October 20, 2026• 1 min
IRENA warns record renewables growth not enough for 1.5°C goal

IRENA warns record renewables growth not enough for 1.5°C goal

Record growth alone cannot deliver Paris goals; electrification, grids and storage are the missing pieces.

October 20, 2026• 1 min
Croatian county pushes solar on public buildings to 2 MW

Croatian county pushes solar on public buildings to 2 MW

Split-Dalmatia's energy agency installs 1.2 MW of solar on public buildings, targets 2 MW by year-end.

October 20, 2026• 1 min
Flow-accelerated corrosion emerges as key concern for CSP molten salt systems

Flow-accelerated corrosion emerges as key concern for CSP molten salt systems

New review links hydrodynamics and electrochemistry in CSP molten salt degradation

October 20, 2026• 1 min